Title: |
Hazard Analysis and Work Authorization |
Publication date: |
2/1/2022 |
Effective date: |
7/30/2015 |
BRIEF
Policy Summary
Lawrence Berkeley National Laboratory's (Berkeley Lab's) Hazard Analysis and Work Authorization Policy ensures that all work is performed in a safe manner by:
- Ensuring that work planning is performed prior to starting work.
- Defining the work scope, analyzing associated hazards, and developing controls such that hazards are identified and mitigated.
- Providing work authorization processes to ensure that procedures, controls, and resources are in place. These processes may include:
- Work Planning and Control (WPC) activities in Activity Manager for work done by workers and affiliates.
- Subcontractor Job Hazards Analysis (sJHA).
- Construction subcontractors' ES&H submittal package (Construction JHA).
- Temporary Work Authorization (TWA).
- Radiological Work Authorization (RWA).
- Facility Work Authorization.
- Ensuring that the process and authorizations are documented prior to starting work.
Who Should Read This Policy
All Berkeley Lab employees, visitors, affiliates, and subcontractors
To Read the Full Policy, Go To:
The POLICY tab on this wiki page
To Read the ES&H Program Details, Go To:
http://www.lbl.gov/ehs/pub3000/CH06.html
http://www.lbl.gov/ehs/pub3000/CH31-quickstart.html
http://www.lbl.gov/ehs/pub3000/CH10-quickstart.html
http://www.lbl.gov/ehs/pub3000/CH21-quickstart.html
http://www.lbl.gov/ehs/pub3000/CH26.html
Contact Information
Work Planning and Control Subject Matter Contact
sJHA - Subcontractor Safety Assurance Program Manager
Construction Safety
Radiation Protection
Biosafety Officer
EHS Division
Title: |
Hazard Analysis and Work Authorization |
Publication date: |
2/1/2022 |
Effective date: |
7/30/2015 |
POLICY
A. Purpose
Lawrence Berkeley National Laboratory's (Berkeley Lab's) Hazard Analysis & Work Authorization Policy ensures that all work is performed in a safe manner by:
- Ensuring that work planning is performed prior to starting work by:
- Defining the work scope.
- Analyzing associated hazards.
- Developing controls such that hazards are identified and mitigated.
- Providing work authorization processes tailored to the type of work that ensure that controls, procedures, and resources are in place. These processes may include:
- Work Planning and Control (WPC) activities in Activity Manager for work done by workers and affiliates.
- Subcontractor Job Hazards Analysis (sJHA).
- Construction subcontractors' ES&H submittal package (Construction JHA).
- Temporary Work Authorization (TWA).
- Radiological Work Authorization (RWA).
- Facility Work Authorization.
- Ensuring that the process and authorizations are documented prior to starting work.
B. Persons Affected
Berkeley Lab employees, visitors, affiliates, and subcontractors who perform work in technical areas or on construction sites
C. Exceptions
Those not performing hands-on work (i.e., those performing work tasks commonly performed by the public), who work 100% at a site not managed by the Berkeley Lab, or who work 100% of the time on the UC Berkeley Campus.
D. Policy Statement
- Safety of all operations at Berkeley Lab is managed according to the principles outlined in the Integrated Environment, Safety, & Health Management Plan: Integrated Safety Management (ISM) System. Using these principles, line management is responsible for assuring safety of its operations by identifying work hazards and developing and implementing tailored controls prior to authorizing work to proceed. The EHS Division collaborates with line management to identify hazards and controls by:
- Identifying appropriate safety standards and requirements.
- Providing institutional tools, procedures, and methods to facilitate control of hazards and compliance with requirements.
- Providing subject-matter-expert support.
- Work authorization, a key principle in safe work planning, is a hazard review and management approval process designed to ensure that procedures, controls, and resources are in place before the work begins. All work at Berkeley Lab proceeds under authorization. Institutional authorization processes have been developed and tailored to facilitate line management authorization activities under a variety of administrative circumstances as follows:
- For Berkeley Lab employees and affiliates, line management authorization for routine work is granted using the Work Planning and Control (WPC) program documented in Chapter 6 of the ES&H Manual.
- Operations in a particular facility, under certain circumstances, may require authorization. Appendix B of the Work Planning and Control program provides general guidance on facility-based authorizations.
- The TWA process may be used only for laser system service/maintenance as allowed in the Laser Safety program of the ES&H Manual.
- For non-construction subcontractors, the sJHA – Subcontractor Job Hazards Analysis (sJHA) program is used to ensure that all non-construction subcontractor work is performed safely and in accordance with Berkeley Lab requirements. For construction activities, Work Process C, Review Selected Subcontractors' EHS Submittal Package(s), of the Construction Safety program is used to ensure that construction subcontractors adequately evaluate hazards and implement safety controls.
- Radiological Work Authorization and Permit Programs are described in Section 21.6, Radiological Work Authorization and Permit Programs, of the Radiation Safety program.
E. Roles and Responsibilities
Role |
Responsibility |
Employees, visitors, and affiliates |
|
Principal investigators, managers, line management supervisors, and work leads |
|
Project Leads, Activity Leads, and Activity Lead Designees |
|
Division directors |
|
Facilities Division |
|
F. Definitions/Acronyms
Term |
Definition |
Line management authorization |
An authorization that is administered by the responsible division doing the work. Examples include the Work Planning and Control (WPC) activities (in Activity Manager), Subcontractor Job Hazards Analysis (sJHA) for non-construction subcontractors, and Contractor JHA for construction subcontractors. |
Formal authorization |
A written document, authorized by the responsible division with EHS (or with a chartered safety committee) review and concurrence, that describes the scope of work, required procedures and controls, authorized materials and equipment to be used, and staff authorized to conduct the work. Examples include Radiological Work Authorizations and research involving human or animal subjects. |
Facility-based authorization |
Hazards analyses and controls are based on the facility as a whole rather than on an individual operation. Examples include Safety Analysis Documents, air and water discharge permits, and NEPA/CEQA analyses. |
G. Recordkeeping Requirements
Record |
Database/Retention Location |
Owner |
WPC Activities |
Activity Manager |
EHS |
sJHAs |
sJHA Database |
EHS |
RWA |
RADAR |
EHS |
TWAs |
Maintained by the authorizing division |
Authorizing Division |
Construction JHA packages |
Construction Project Documents |
Facilities Division |
Facility-Based Authorizations |
Maintained by the host Division |
Host Division |
EHS Training Records |
EHS Training Database |
EHS |
H. Implementing Documents
Document Number |
Title |
Type |
07.02.003.001 |
Program |
|
07.07.007.001 |
Program |
|
07.07.018.001 |
Program |
|
07.08.001.001 |
Program |
|
07.07.004.001 |
Program |
|
03.02.002.001 |
Program |
|
07.02.004.001 |
Program |
|
07.02.004.002 |
Work Process |
|
07.02.004.003 |
Work Process B, Creating an sJHA |
Work Process |
07.02.004.004 |
Work Process C, Training and Orientation |
Work Process |
I. Contact Information
Work Planning and Control Subject Matter Contact
sJHA - Subcontractor Safety Assurance Program Manager
Construction Safety
Radiation Protection
Biosafety Officer
EHS Division
J. Revision History
Date |
Revision |
By Whom |
Revision Description |
Section(s) Affected |
Change Type |
1/2/2012 |
0 |
J. Heim |
Reformat for wiki (brief) |
All |
Minor |
12/18/2012 |
1 |
J. Heim |
Reformat for wiki (policy) |
All |
Minor |
1/14/2014 |
1.1 |
W. Wells |
Revise as Policy Overview |
All |
Minor |
8/31/2015 |
2 |
A. Peterson |
Policy revised to sync with new program |
All |
Major |
2/1/2022 |
2.1 |
J. Heim |
Periodic review: minor clarifications to the policy text. |
All |
Minor |
DOCUMENT INFORMATION
Title: |
Hazard Analysis and Work Authorization |
Document number |
07.02.003.000 |
Revision number |
2.1 |
Publication date: |
2/1/2022 |
Effective date: |
7/30/2015 |
Next review date: |
2/1/2027 |
Policy Area: |
Safe Work Authorization |
RPM Section (home) |
Environment, Safety and Health |
RPM Section (cross-reference) |
none |
Functional Division |
EHS |
Prior reference information (optional) |
ES&H Manual Chapter 6 |
Source Requirements Documents
- Title 29, Code of Federal Regulations, Section 1910.119, Process Safety Management of Highly Hazardous Chemicals
- DOE Order 420.2C, Safety of Accelerator Facilities
- DOE Order 435.1, Radioactive Waste Management (only those sections/subchapters adopted into the current Contract 31 ESH Standards set)
- California Public Resources Code, Section 21000 et seq. (CEQA, California Environmental Quality Act)
- Title 19, California Code of Regulations, Section 2770.5, List of Substances
- Title 22, California Code of Regulations, Section 66260.1 et seq., California Hazardous Waste Regulations
Other Driving Requirements
- Title 42, United States Code, Section 4321 et seq. (NEPA, National Environmental Policy Act)
Implementing Documents
Document Number |
Title |
Type |
07.02.003.001 |
Program |
|
07.07.007.001 |
Program |
|
07.07.018.001 |
Program |
|
07.08.001.001 |
Program |
|
07.07.004.001 |
Program |
|
03.02.002.001 |
Program |
|
07.02.004.001 |
Program |
|
07.02.004.002 |
Work Process A, sJHA Process Overview |
Work Process |
07.02.004.003 |
Work Process B, Creating an sJHA |
Work Process |
07.02.004.004 |
Work Process C, Training and Orientation |
Work Process |