Title: |
Elevated Work |
Publication date: |
8/12/2020 |
Effective date: |
8/12/2020 |
BRIEF
Policy Summary
The Elevated Work Program at Berkeley Lab ensures that the equipment and structures for accessing and working at elevated levels are maintained and operated according to safe practices and regulations. The Elevated Work Program also:
- Establishes minimum performance requirements for elevated work at the Laboratory.
- Provides training and familiarization for elevated work operations, policies, and procedures.
- Provides work oversight to ensure personnel performing elevated work are authorized.
- Reviews elevated work observation metrics to forecast safe and unsafe trends of employees performing work.
Who Should Read This Policy
Berkeley Lab employees, casual and participating visitors, affiliates, and subcontractors when performing work on aerial platforms, ladders, or scaffolds.
To Read the Full Policy, Go To:
The POLICY tab on this wiki page
To Read the Full Program Details, Go To:
Contact Information
EHS Subject Matter Expert for Aerial/Scissor Lifts and Scaffold Safety
EHS Division
Title: |
Elevated Work |
Publication date: |
8/12/2020 |
Effective date: |
8/12/2020 |
POLICY
A. Purpose
The Elevated Work Program at Berkeley Lab ensures that the equipment and structures for accessing and working at elevated levels are maintained and operated according to safe practices and regulations. The Elevated Work Program also:
- Establishes minimum performance requirements for elevated work at the Laboratory.
- Provides training and familiarization for elevated work operations, policies, and procedures.
- Provides work oversight to ensure personnel performing elevated work are authorized.
- Reviews elevated work observation metrics to forecast safe and unsafe trends of employees performing work.
B. Persons Affected
Berkeley Lab employees, casual and participating visitors, affiliates, and subcontractors when performing work on Mobile Elevating Work Platforms (MEWP), ladders, or scaffolds.
C. Exceptions
None
D. Policy Statement
- The Elevated Work Program covers use requirements for Mobile Elevating Work Platforms (MEWP), ladders, and scaffolds (Work Process A).
- The purchase of an MEWP is a controlled item for procurement purposes, and procurement personnel need to ensure that the subject matter expert (SME) approves all purchases (Work Process B).
- Operation of MEWPs and the use of ladders or scaffolding are restricted to trained personnel who have completed required Berkeley Lab training and who have been certified for specific types of equipment in accordance with the requirements of this chapter. Laboratory employees must also be authorized a specific Work Planning & Control activity to operate MEWPs or use ladders or scaffolds (Work Process C).
- The Berkeley Lab Fall Protection Permit is the planning document required for elevated work in MEWPs and for work from ladders and scaffolds at heights greater than six feet (Work Process D).
E. Roles and Responsibilities
Managers, supervisors, and employees have the responsibility to adhere to the provisions of this policy.
Role |
Responsibility |
Authorized Person (Worker or Operator) |
|
Competent Person |
|
Elevated Work Subject Matter Expert (SME – Program Manager) |
|
Line Management |
Responsible for ensuring that elevated work is performed safely and that MEWP operators and users of ladders or scaffolds are properly qualified and authorized. |
F. Definitions/Acronyms
Term |
Definition |
Ladder |
An appliance usually consisting of two side rails joined at regular intervals by cross-pieces called steps, rungs, or cleats, on which a person may step while ascending or descending |
Mobile Elevating Work Platform (MEWP) |
A mobile device that has an adjustable position platform, supported from the ground level by a structure. Examples include boom lifts and scissor lifts. |
Operator |
A qualified person who controls the movement of an MEWP |
Scaffold |
Any temporary elevated platform and its supporting structure used for supporting workers or materials or both |
G. Recordkeeping Requirements
- Operator qualifications (current), EHS Training Records
- Authorized Persons (current), EHS Training Records
- Training records (current), EHS Training Records
- Equipment inspection records (1 year), Equipment Manager
H. Implementing Documents
Document Number |
ES&H Manual Reference |
Title |
Type |
07.07.001.001 |
Chapter 35 |
Elevated Work – Mobile Elevating Work Platforms, Ladders, and Scaffolds |
Program |
07.07.001.002 |
Chapter 35, Work Process A |
General Requirements |
Process |
07.07.001.003 |
Chapter 35, Work Process B |
Procurement of Mobile Elevating Work Platforms, Ladders, or Scaffolding |
Process |
07.07.001.004 |
Chapter 35, Work Process C |
Authorization and Qualification |
Process |
07.07.001.005 |
Chapter 35, Work Process D |
Fall Protection |
Process |
07.07.001.006 |
Chapter 35, Work Process E |
MEWP Inspections |
Process |
|
Chapter 35, Work Process F |
MEWP Rescue Plan |
Process |
07.07.007.001 |
Chapter 10 |
Program |
|
07.07.014.001 |
Chapter 30 |
Program |
I. Contact Information
EHS Subject Matter Expert for Aerial/Scissor Lifts and Scaffold Safety
EHS Division
J. Revision History
Date |
Revision |
By Whom |
Revision Description |
Section(s) Affected |
Change Type |
1/2/2012 |
0 |
M. Rice |
Rewrite for wiki |
All |
Minor |
10/23/2012 |
1 |
M. Rice |
Rewrite for wiki |
All |
Minor |
9/13/2017 |
1.1 |
E. Tucker |
Update |
All |
Minor |
10/15/19 |
2 |
E. Tucker |
Program update – adoption of Cal/OSHA and ANSI/ASSP requirements |
All |
Moderate |
DOCUMENT INFORMATION
Title: |
Elevated Work |
Document number |
07.07.001.000 |
Revision number |
2 |
Publication date: |
8/12/2020 |
Effective date: |
8/12/2020 |
Next review date: |
8/12/2023 |
Policy Area: |
Industrial Hygiene and Safety |
RPM Section (home) |
ESH |
RPM Section (cross-reference) |
none |
Functional Division |
EHS |
Prior reference information (optional) |
ES&H Manual, Chapter 35 , |
Source Requirements Documents
- 10 CFR 851.23, Worker Safety and Health Program, Safety and Health Standards
- CCR Title 8 Subchapter, Article 24. Elevating Work Platforms and Aerial Devices
- ANSI/SAIA_A92.22-2018 and A92.24-2018 MEWP Standards
- CCR Title 8 Subchapter 4 Articles 21 and 22, Subchapter 7 Article 23 (Cal/OSHA) and adoption of ANSI/ASSP A10.8-2019 Scaffolding Safety Requirements
- 29 CFR 1926, Subpart M, Fall Protection
Implementing Documents
Document Number |
ES&H Manual Reference |
Title |
Type |
07.07.001.001 |
Chapter 35 |
Elevated Work – Mobile Elevating Work Platforms, Ladders, and Scaffolds |
Program |
07.07.001.002 |
Chapter 35, Work Process A |
General Requirements |
Process |
07.07.001.003 |
Chapter 35, Work Process B |
Procurement of Mobile Elevating Work Platforms, Ladders, or Scaffolding |
Process |
07.07.001.004 |
Chapter 35, Work Process C |
Authorization and Qualification |
Process |
07.07.001.005 |
Chapter 35, Work Process D |
Fall Protection |
Process |
07.07.001.006 |
Chapter 35, Work Process E |
MEWP Inspections |
Process |
|
Chapter 35, Work Process F |
MEWP Rescue Plan |
Process |
07.07.007.001 |
Chapter 10 |
Program |
|
07.07.014.001 |
Chapter 30 |
Program |
ADDITIONAL INFORMATION
Title: |
Elevated Work |
||
Document number |
07.07.001.000 |
||
Revision number |
2 |
||
Publication date: |
8/12/2020 |
||
Effective date: |
8/12/2020 |
||
Next review date: |
8/12/2023 |
||
Policy Area: |
Industrial Hygiene and Safety |
||
RPM Section (home) |
ESH |
||
RPM Section (cross-reference) |
None |
||
Functional Division |
EHS |
||
Author name/contact info |
M. Rice |
||
|
|
||
Revision 0 publication date |
1/2/2012 |
||
Retirement date |
n/a |
||
Prior reference information (optional) |
PUB-3000, Chapter 5, Section 5.2 |
||
|
|
||
Inputs from more than one Functional Area? |
No |
||
List additional Functional Areas & contacts |
|
||
|
|
||
Inputs from more than one Policy Area? |
No |
||
List additional Policy Areas & contacts |
|
||
|
|
||
30-day notification needed? |
No |
||
30-day start date |
n/a |
||
30-day end date |
n/a |
||
|
|
||
LDAP protected? |
No |
||
|
|
||
Need TABL reminders? |
No |
||
Frequency |
n/a |
||
Brief reminder text: |
n/a |
||
|
|
||
<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="093da2a8-c43e-468d-ad42-fb49d17a01bf"><ac:plain-text-body><![CDATA[ |
Approval Sheet for this revision received (date) [Note: author is responsible} |
|
]]></ac:plain-text-body></ac:structured-macro> |
Keyword search words, phrases:
- AWPs, Aerial Work Platforms, Elevated Work Program, ladders, scaffolds, Fall Protection
New terms that need to be added to Glossary/Acronym list:
- (list items not found and context (Policy Area name) – full definition would be included in Policy)
Implementing Documents restricted to department/functional use
(optional – these will be used for tracing between requirements and associated documents)
Document number |
Title |
07.07.001.001 |
Elevated Work — Aerial Work Platforms, Ladders, and Scaffolds |
|
|
Side bars: Side bar 1 location (cite by Policy Section # - for example: Section 4.E.2)Sidebar 1 text: Sidebar 2 locationSidebar 2 text: Sidebar 3 locationSidebar 3 text: