idHazard Analysis and Work Authorization
Card
labelBrief

Anchor
_Hlk94605564
_Hlk94605564

Title:

Hazard Analysis

...

and Work Authorization

...

Publication date:

2/1/

...

2022

Effective date:

...

7/

...

30/

...

2015

BRIEF

Policy Summary

Lawrence Berkeley National Laboratory's (Berkeley Lab's) Hazard Analysis

...

and Work Authorization Policy ensures that all work is performed in a safe manner by:

  • Ensuring that work planning is performed prior to starting work.
  • Defining the work scope, analyzing associated hazards, and developing controls such that hazards are identified and mitigated.
  • Providing work authorization processes to ensure that procedures, controls, and resources are in place. These processes may include:

    ...

      • Work Planning and Control (WPC) activities in Activity Manager for work done by workers and affiliates

    ...

      • .
      • Subcontractor Job Hazards Analysis (sJHA).
      • Construction subcontractors' ES&H submittal package (Construction JHA)

    ...

      • .
      • Temporary Work Authorization (TWA)

    ...

      • .
      • Radiological Work Authorization (RWA).
      • Facility Work Authorization.
    • Ensuring that the process and authorizations are documented prior to starting work.

    Who Should Read This Policy

    All Berkeley Lab employees, visitors, affiliates, and subcontractors

    To Read the Full Policy, Go To:

    The POLICY tab on this wiki page

    To Read the ES&H Program Details, Go To:

    http://www.lbl.gov/ehs/pub3000/CH06.html

    ...

    http://www.lbl.gov/ehs/pub3000/CH31-quickstart.html

    ...


    http://www.lbl.gov/ehs/pub3000/

    ...

    CH10-quickstart.html
    http://www.lbl.gov/ehs/pub3000/CH21-quickstart.html
    http://www.lbl.gov/ehs/pub3000/CH26.html

    Contact Information

    ...

    Work Planning and Control Subject Matter Contact
    sJHA - Subcontractor Safety Assurance Program Manager
    Construction Safety

    Radiation Protection

    Biosafety Officer

    EHS Division

    Card
    labelPolicy

    Title:

    Hazard

    ...

    Analysis and Work Authorization

    ...

    Publication date:

    2/1/

    ...

    2022

    Effective date:

    ...

    7/

    ...

    30/

    ...

    2015

    POLICY

    A. Purpose

    Lawrence Berkeley National Laboratory's (Berkeley Lab's) Hazard Analysis & Work Authorization Policy ensures that all work is performed in a safe manner by:

    • Ensuring that work planning is performed prior to starting work by:
      • Defining the work scope.
      • Analyzing associated hazards.
      • Developing controls such that hazards are identified and mitigated.
    • Providing work authorization processes tailored to the type of work that ensure that controls, procedures, and resources are in place. These processes may include:

      ...

        • Work Planning and Control (WPC) activities in Activity Manager for work done by workers and affiliates

      ...

        • .
        • Subcontractor Job Hazards Analysis (sJHA).
        • Construction subcontractors' ES&H submittal package (Construction JHA)

      ...

        • .
        • Temporary Work Authorization (TWA)

      ...

        • .
        • Radiological Work Authorization (RWA).
        • Facility Work Authorization.
      • Ensuring that the process and authorizations are documented prior to starting work.

      B. Persons Affected

      Berkeley Lab employees, visitors, affiliates, and subcontractors who perform work in technical areas or on construction sites

      C. Exceptions

      Those not performing hands-on work (i.e., those performing work tasks commonly performed by the public), who work 100% at a site not managed by the Berkeley Lab, or who work 100% of the time on the UC Berkeley Campus.

      D. Policy Statement

      1. Safety of all operations at Berkeley Lab is managed according to the principles outlined in

      ...

      1. the Integrated Environment, Safety, & Health Management Plan: Integrated Safety Management (ISM) System. Using these principles, line management is responsible for assuring safety of its operations by identifying work hazards and developing and implementing tailored controls prior to authorizing work to proceed. The EHS Division collaborates with line management to identify hazards and controls by:
        1. Identifying appropriate safety standards and requirements.
        2. Providing institutional tools, procedures, and methods to facilitate control of hazards and compliance with requirements

      ...

        1. .
        2. Providing subject-matter-expert support.
      1. Work authorization, a key principle in safe work planning, is a hazard review and management approval process designed to ensure that procedures, controls, and resources are in place before the work begins. All work at Berkeley Lab proceeds under authorization. Institutional authorization processes have been developed and tailored to facilitate line management authorization activities under a variety of administrative circumstances as follows:
        1. For Berkeley Lab employees and affiliates, line management authorization for routine work is granted using the

      ...

        1. Work Planning and Control (WPC) program documented in Chapter 6 of the ES&H Manual.
        2. Operations in a particular facility, under certain circumstances, may require authorization.

      ...

        1. Is not a permanent component of ongoing work
        2. Does not involving elevated hazards
        3. Is of a short-term duration (two weeks or less)
        4. Has a limited and clearly defined scope
        1. Appendix B of the Work Planning and Control program provides general guidance on facility-based authorizations

      ...

        1. .
          1. The TWA process may be used only for laser system service/maintenance as allowed in the Laser Safety program of the ES&H Manual.
        1. For non-construction subcontractors, the sJHA – Subcontractor Job Hazards Analysis (sJHA) program is used to ensure that all non-construction subcontractor work is performed safely and in accordance with Berkeley Lab requirements.

      ...

        1. For construction activities,

      ...

        1. Work Process C, Review Selected Subcontractors' EHS Submittal Package(s), of the Construction Safety program is used to ensure that construction subcontractors adequately evaluate hazards and implement safety controls.

      ...

        1. Radiological Work Authorization and Permit Programs are described in

      ...

        1. Section 21.6, Radiological Work Authorization and Permit Programs, of the Radiation Safety program.

      E. Roles and Responsibilities

      Role

      Responsibility

      Employees, visitors, and affiliates

      • Perform only work for which they are authorized and qualified.

      Principal investigators, managers, line management supervisors, and work leads

      • Identify the hazards associated with the work to be performed.
      • Supply the controls necessary to perform the work safely.
      • Assure that employees under their supervision

      ...

      • are authorized under appropriate authorization systems and are appropriately trained (Berkeley Lab training requirements as defined by assigned activities or assigned by the EHS Training Program (see also the EHS Training website).
      • Assure that all work under their control is evaluated to determine the level of authorization required by this program, and that proper authorization is obtained before beginning work.
      • Assure that all work under their control is performed in compliance with the controls specified for that work.
      • Assure that authorizations for work under their control are reauthorized as required, including whenever work changes significantly.

      Project Leads, Activity Leads, and Activity Lead Designees

      • Implement work and worker authorization processes as required by the ES&H Manual Work Planning and Control program. This includes defining work scopes, analyzing hazards, and assigning and authorizing workers.

      Division directors

      • Assure that all work spaces are evaluated at least annually for identification of hazards and implementation of controls.
      • Assure that all work has obtained line management, formal, or facility-based authorization, as required.

      Facilities Division

      • Assures work by construction subcontractors is properly evaluated and authorized under construction

      ...

      • subcontractors'

      ...

      • ES&H submittals (Construction JHA documents).
      • Prepares the appropriate NEPA/CEQA documentation.

      F. Definitions/Acronyms

      Term

      Definition

      ...

      Line management authorization

      ...

      Facility-based authorizationHazards analyses and controls are based on the facility as a whole rather than on an individual operation. Examples include Safety Analysis Documents, air and water discharge permits, and NEPA/CEQA analyses

      ...

      .
      Formal authorizationA written document, authorized by the responsible division with EHS

      ...

      (or with a chartered safety committee) review and concurrence, that describes the scope of work, required procedures and controls, authorized materials and equipment to be used, and staff authorized to conduct the work. Examples include Radiological Work Authorizations

      ...

      and research involving human or animal subjects

      ...

      .

      ...

      Facility-based authorization

      ...

      Line management authorization

      An authorization that is administered by the responsible division doing the work. Examples include the Work Planning and Control (WPC) activities (in Activity Manager), Subcontractor Job Hazards Analysis (sJHA) for non-construction subcontractors, and Contractor JHA for construction subcontractors.

      G. Recordkeeping Requirements

      Record

      Database/Retention Location

      Owner

      ...

      JHAs

      WPC Activities

      Activity Manager

      ...

      EHS

      ...

      AHDs

      ...

      AHD Database

      ...

      EHS

      sJHAs

      sJHA Database

      EHS

      RWA

      RADAR

      EHS

      ...

      Biosafety Work Authorization

      ...

      Biosafety Authorization System (BAS)

      ...

      EHS

      TWAs

      Maintained by the authorizing division

      Authorizing Division

      Construction JHA packages

      Construction Project Documents

      Facilities Division

      Facility-Based Authorizations

      Maintained by the host Division

      Host Division

      EHS Training Records

      ...

      EHS Training Database

      EHS

      H. Implementing Documents

      Document Number

      Title

      Type

      07.02.003.001

      ...

      ...

      ...

      Work Process A, Line Management Authorizations for Routine or Special Hazards

      ...

      Work Process

      07.

      ...

      Work Process B, Facility-Based Authorizations

      ...

      Work Process

      ...

      07.02.003.004

      ...

      Work Process C, Formal Authorizations for Increased Hazards

      ...

      Work Process

      ...

      007.001

      Construction Safety

      Program

      07.07.018.001

      ...

      Laser Safety

      Program

      07.08.001.001

      Radiation Safety

      Program

      07.07.004.001

      Biosafety

      Program

      03.02.002.001

      Research with Human and Animal Subjects

      Program

      07.02.004.001

      sJHA – Subcontractor Job Hazards Analysis

      Program

      07.02.004.002

      Work Process A, sJHA Process Overview

      Work Process

      07.02.004.003

      Work Process B, Creating an sJHA

      Work Process

      07.02.004.004

      Work Process C, Training and Orientation

      Work Process

      ...

      07.02.001.001

      ...

      Job Hazards Analysis

      ...

      Program

      I. Contact Information

      ...

      Work Planning and Control Subject Matter Contact
      sJHA -
      Subcontractor Safety Assurance Program Manager
      Construction Safety
      Radiation Protection

      Biosafety Officer

      EHS Division


      J. Revision History

      Date

      Revision

      By

      ...

      Whom

      Revision Description

      Section(s)

      ...

      Affected

      Change Type

      1/2/2012

      0

      J. Heim

      Reformat for wiki (brief)

      All

      Minor

      12/18/2012

      1

      J. Heim

      Reformat for wiki (policy)

      All

      Minor

      1/14/

      ...

      2014

      1.1

      W. Wells

      Revise as Policy Overview

      All

      Minor

      ...

      8/31/2015

      2

      A. Peterson

      Policy revised to sync with new program

      All

      Major

      2/1/2022

      2.1

      J. Heim

      Periodic review: minor clarifications to the policy text.

      All

      Minor

      Card
      labelDocument Information

      ...

      DOCUMENT INFORMATION

      Title:

      Hazard

      ...

      Analysis and Work Authorization

      ...

      Document number

      07.02.003.000

      Revision number

      ...

      2.1

      Publication date:

      2/1/

      ...

      2022

      Effective date:

      ...

      7/

      ...

      30/

      ...

      2015

      Next review date:

      2/1/

      ...

      2027

      Policy Area:

      Safe Work Authorization

      RPM Section (home)

      Environment, Safety and Health

      RPM Section (cross-reference)

      none

      Functional Division

      EHS

      Prior reference information (optional)

      ...

      ES&H Manual Chapter 6

      Source Requirements Documents

      • Title 29, Code of Federal Regulations, Section 1910.119, Process Safety Management of Highly Hazardous Chemicals
      • DOE Order 420.2C, Safety of Accelerator Facilities
      • DOE Order 435.1, Radioactive Waste Management (only those sections/subchapters adopted into the current Contract 31 ESH Standards set)
      • California Public Resources Code, Section 21000 et seq. (CEQA, California Environmental Quality Act)
      • Title 19, California Code of Regulations, Section 2770.5, List of Substances
      • Title 22, California Code of Regulations, Section 66260.1 et seq., California Hazardous Waste Regulations

      Other Driving Requirements

      • Title 42, United States Code, Section 4321 et seq. (NEPA, National Environmental Policy Act)

      Implementing Documents

      Document Number

      Title

      Type

      07.02.003.001

      ...

      ...

      ...

      .

      ...

      Work Process A, Line Management Authorizations for Routine or Special Hazards

      ...

      Work Process

      ...

      07.02.003.003

      ...

      Work Process B, Facility-Based Authorizations

      ...

      Work Process

      ...

      07.02.003.004

      ...

      Work Process C, Formal Authorizations for Increased Hazards

      ...

      Work Process

      07.

      ...

      007.001

      Construction Safety

      Program

      07.07.018.001

      ...

      Laser Safety

      Program

      07.08.001.001

      Radiation Safety

      Program

      07.07.004.001

      Biosafety

      Program

      03.02.002.001

      Research with Human and Animal Subjects

      Program

      07.02.004.001

      sJHA – Subcontractor Job Hazards Analysis

      Program

      07.02.004.002

      Work Process A, sJHA Process Overview

      Work Process

      07.02.004.003

      Work Process B, Creating an sJHA

      Work Process

      07.02.004.004

      Work Process C, Training and Orientation

      Work Process

      ...

      07.02.001.001

      ...

      Job Hazards Analysis

      ...

      Program

      Show If
      grouprpm2-admins
      Card
      labelAdditional Information

      ADDITIONAL INFORMATION 

      ...

      Title:

      Hazard Analysis

      ...

      and Work Authorization

      ...

      Document number

      07.02.003.000

      Revision number

      ...

      2.1

      Publication date:

      2/1/

      ...

      2022

      Effective date:

      ...

      7/

      ...

      30/

      ...

      2015

      Next review date:

      2/1/

      ...

      2027

      Policy Area:

      Safe Work Authorization

      RPM Section (home)

      Environment, Safety and Health

      RPM Section (cross-reference)

      None

      Functional Division

      EHS

      Author name/contact info

      W. Wells

      ...

       

      ...



      Revision 0 publication date

      1/2/2012

      Retirement date

      ...

       


      Prior reference information (optional)

      ...

       

      ...

       

      ...

       




      Inputs from more than one Functional Area?

      ...

       


      List additional Functional Areas & contacts

      ...

       

      ...

      ...

       




      Inputs from more than one Policy Area?

      ...

       


      List additional Policy Areas & contacts

      ...

       

      ...

      ...

       




      30-day notification needed?

      ...

       


      30-day start date

      ...

       


      30-day end date

      ...

       

      ...

       

      ...

       




      LDAP protected?

      ...

       

      ...

       

      ...

       




      Need TABL reminders?

      ...

       


      Frequency

      ...

       

      ...


      Brief reminder text:

      ...

       




      <ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="f59a9a5f-8b2e-45fe-9ff6-8c603df2f2d6"><ac:plain-text-body><![CDATA[

      Approval Sheet for this revision received (date)

      ...

      [Note: author is responsible}

      ...


      ]]></ac:plain-text-body></ac:structured-macro>

      Key labels/tags:

      • (Policy Area 1), (Policy Area 2), (Section)

      New terms that need to be added to Glossary/Acronym list:

      • (list items not found and context (Policy Area name) – full definition would be included in Policy)

      Implementing Documents restricted to department/functional use

      (optional – these will be used for tracing between requirements and associated documents)

      Document number

      Title

      ...

       

      ...

       

      ...

      ...

       





      Side bars:

      Side bar 1 location (cite by Policy Section # - for example: Section D.2.a)
      Sidebar 1 text:

      Sidebar 2 location
      Sidebar 2 text:

      Sidebar 3 location
      Sidebar 3 text:

      ...