Planned Outage Map

On the LBNL Planned Outage Map, you can view current and future outages.  The map is updated as new information comes in. 

Visit Planned Outage Map



Facilities Preventive Maintenance (2020-2028)

Access the Facilities 3-yr preventive maintenance schedule planned for 2020-2028 below. 

Facilities Preventive Maintenance Schedule



2020 - Building Power Outage - B91/B91U SURP Construction

Saturday, September 19 from 6:00 AM through 6:00 PM

Buildings affected:

  • B91, B91U

Building impacts:

  • Stand-By Generator Power will be available
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Frequently Asked Questions: LINK



2020 - CMLC Water Line Project - Outage Notification

Wednesday, September 16 through Thursday, September 17

As part of the CMLC water line project, we will be tying in new water piping on 9/16/20 and 9/17/20 and impacting various buildings as follows:

B62: The building will be closed to occupants on 9/16 & 9/17 per building management. Please note that domestic and industrial water will be maintained by back-feeding water to hydrant 59 in order to maintain cooling to B72; however, fire water will be down both days, 9/16/20 and 9/17/20. We will request site security to do fire watch. Hot work will not be permitted in the building. LBNL crafts will also be repairing the fire alarm system and backflow preventer during this same shutdown and no additional impacts are anticipated. 

B66: The building will be closed to occupants on 9/16 & 9/17 per building management. Domestic and Industrial water will be down for one day, 9/16/20. Both restrooms and emergency showers/emergency eye washes will be down this day as well. Fire water will NOT be impacted. LBNL crafts will also be repairing the backflow preventer during this same shutdown and no additional impacts are anticipated. 

B72: There will be no anticipated impacts to B72 occupants. We plan to backfeed water to B62 to keep the B72 cooling water loop live during the outage.

B73: Domestic water, Industrial water and Fire water will be down for two days, 9/16/20 and 9/17/20. Both restrooms and emergency showers/emergency eye washes will be down this day as well. No hot work will be possible during this time. We will  request site security to do fire watch during this time.



2020 - SW-A3 / ALS Power Outage

Saturday, August 29, 5:00 AM through Sunday, August 30, 8:00 PM

Buildings affected:

  • B6, B7, B45, B48, B80, and B80A

Building impacts:

  • E-circuit loads on standby generator power will be available in B6, B45, B48, B80
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Frequently Asked Questions: LINK



2020 - SW-A6 Line 1 Multiple Building Power Outage

Saturday, August 22 6:00 AM through 8:00 PM

Buildings affected:

  • B55 Complex, B56 Complex, B60, B63, B64, B71 Complex, B90, B90X

Building impacts:

  • Stand-By Generator Power will be available in B55, B56, B64, B90
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Frequently Asked Questions: LINK



2020 - SW-A6 Line 2 Multiple Building Power Outage

Friday, July 17 from 6:00 AM through Sunday, July 19 8:00 PM





Buildings Affected / Tasks / Outage DurationJul 17Jul 18Jul 19

B65 Complex, B88 & Blackberry Gate - preventive maintenance for banks 80, 198 & various panels in B88

Off Friday @ 6 a.m.; power returns Saturday at approximately 8 p.m.

XX

B50A, B50B, B50C, B50E, B50F - preventive maintenance for banks 35, 38, 480

Off Saturday @ 6 a.m.; power returns Saturday at approximately 8 p.m.


X

B50, B54, B70, B70A - preventive maintenance for banks 25, 30, 31, 70 & MCC in B70A

Off Saturday @ 6 a.m.; power returns Sunday at approximately 8 p.m.


XX


Building impacts:

  • Stand-By Generator Power will be available B50A, B50B, B70, B70A, B88
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Frequently Asked Questions: LINK



2020 - Building Power Outage - B91/B91U SURP Construction (Postponed)

Saturday, August 1 from 6:00 AM through 8:00 PM

Buildings affected:

  • B91, B91U

Building impacts:

  • Stand-By Generator Power will be available
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Frequently Asked Questions: LINK



2020 - Building Power Outage - B59 Electrical Upgrade

Friday, July 10 from 5:00 PM through Sunday, July 12 8:00 PM

Buildings affected:

  • B59

Building impacts:

  • Stand-By Generator Power will be available
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Frequently Asked Questions: LINK



2020 - Building Power Outage - SURP & MUP Construction

Saturday, June 13 from 6:00 AM through 8:00 PM

Buildings affected:

  • B51F, B56, & B64

Building impacts:

  • Stand-By Generator Power will be available for B64 only
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Frequently Asked Questions: LINK



2020 - July and August Electrical Shutdowns Planned

This is advance notice that Facilities is planning two electrical shutdowns for electrical distribution maintenance scheduled in July and August.  All power, except standby generator power, will be shut down to the affected buildings listed below. Facilities is providing this early notice so that Divisions can plan their research to minimize impacts to their science.

Electrical services, devices, and equipment connected to standby generator power will remain energized during the shutdown.  Please identify critical equipment that is not connected to standby generator power, that cannot remain off for 12+ hours, and that is critical equipment requiring temporary generator power during this shutdown.  Please add temporary power needs to the links below in the following spreadsheets.

Thank you for your cooperation and we will continue regular communications and assistance with you and your team leading up to this maintenance shutdown event.  Feel free to contact your respective Facility Area Manager with any questions.



2019 - Building Power Outage - SW-A4 Line 1

Saturday, July 13 from 5:00 AM through 5:00 PM

Buildings affected:

  • B2, B10A, B15, B23 (Guest House), B34, B37, and B43

Building impacts:

  • Stand-By Generator Power will be available
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation

Temporary Power Request Form



2019 - Low Conductivity Water (LCW NO FLOW) Shutdown

Thursday, July 11 at 3:00 PM – Tuesday, July 16 at 8:00 AM

Buildings affected:

  • B2, B6, B15, B27, B46, B53, B58, B58A, B80

Equipment affected:

  • All programmatic equipment currently cooled by LCW should be shut down.



2019 - Treated Water (TRW NO FLOW) Shutdown

Thursday, July 11 at 3:00 PM – Tuesday, July 16 at 8:00 AM

Buildings affected:

  • B2

Equipment affected:

  • Building Main Chillers- Office and Lab cooling will not be provided during the shutdown
  • AC Unit in B2-119
  • Process Cooling Chiller to 3rd Floor Laser Labs


2019 - Building Power Outage - SW-A4 Line 2

Saturday, August 10 from 5:00 AM through 5:00 PM

Buildings affected:

  • B17, B27, B30, B33, B33U, B47, B46, B53, B58, & B58A

Building impacts:

  • Stand-By Generator Power will be available
  • Outage conditions are not conducive to performing work
  • Restricted access to avoid workers in the labs without proper ventilation