Data

  • All data stored here
  • Reference cable naming here
  • Reference drawing
    • tunnel 23W2495

Measurement Equipment

EquipmentMPNSerialCalibration and Settings
Peak RF Power Meter

Confirmed functional CW
High Speed Scope

  • LINAC RF MASTER as the trigger
    • Is this accessible?
N type female-female adapter


N type cable


3 dB splitter


(N type splitter set)


Relevant Interlocks

  • Confirm signals currently in procedure are not connected to any interlocks

Setup Notes

SignalAssigned CableCurrently connectedCable/ chassis used for 2025 measurementsAdapter Used for RF Power (#1 - #5)


(dB)

Cable Loss (dB)Power at Rack cable output (dBm)Peak RF PowerTrigger
AS1 Load FWD103

VIDEO DETECTOR #7 PG2

(Coupler + LPF)

102 - LI1838

OR 105 AS2 IN REV (closer in ALS, farther outside tunnel)


84.19


~56.895.99LI1838
S Band Buncher FWD100

VIDEO DETECTOR #4 PG2

(Coupler + LPF)

102 -LI1838

76.8 

~510.492.2
AS1 FWD102

Coupler + LPF


102 -LI1838


83.99 

~5

8.4

97.39
AS1 REV101 (is this actually 104?)

VIDEO DETECTOR #5 PG2

(Coupler + LPF)

102 -LI1838
71.44

~5

-16.6

59.84
AS2 Load FWD107

Coupler + LPF

107- LI2120
83.82~54.993.72LI2120
S Band Buncher REV104 (does this exist yet? not 104?)

Coupler + LPF

104 -LI2120
60.8~5-14.8550.95
AS2 FWD106

Coupler + LPF


106-LI2120
84.05~510.499.45
AS2 REV105

VIDEO DETECTOR #8 PG2

105-LI2120
71.15~54.280.35
KLY1 FWD108

MOD1 CP 

outside tunnel

 102

KLY1 REV109

MOD1 CP 

outside tunnel

 82

Kly2 FWD112

MOD2 CP

outside tunnel

 102

Kly2 REV113

MOD2 CP 

outside tunnel

 82

125 MHZ CAVnot yet assigned

?



??



500 MHZ CAVnot yet assigned

?



??



125 MHZ DRIVER FWDnot yet assigned

?

outside tunnel





125 MHZ CAV FWDnot yet assigned

?

outside tunnel





125 MHZ CAV REVnot yet assigned

?

outside tunnel





500 MHZ DRIVER FWDnot yet assigned

?

outside tunnel





500 MHZ CAV FWDnot yet assigned

?

outside tunnel





500 MHZ CAV REVnot yet assigned

?

outside tunnel





Procedure

  1. Open Gun/LINAC tunnel
  2. Install step 4 splitters
  3. Close Gun/LINAC tunnel
  4. Measure all nominally connected tunnel signals:
    1. AS1 FWD - 102
    2. AS2 Load FWD
    3. S Band Buncher REV
    4. AS2 FWD
  5. Install step 6 splitters, using step 4 cables
  6. Measure adjacently connected tunnel signals:
    1. AS1 Load FWD
    2. S Band Buncher FWD
    3. AS1 REV
    4. AS2 REV
  7. (Reset tunnel connections)