The subsystem status is found on the right hand side of the main window on all 3 control PC's (BCS, ES, ACQ).
It indicates the status of the main subsystem of the 12.2.2 control system. For operation, all BCS and ACQ susbsystem indicators need to be green.
Green: Good to go
Grey: has not been started yet. Left click on LED symbol and choose 'Start'.
Yellow: Usually means that the system is in the process of starting. This will turn green or orange.
Orange: There is a fault in the system. You can try to restart it by left clicking the symbol and choosing 'Restart'; if that doesn't help call a beamline staff.
Red: The subsystem has been automatically (usually accompanied by an error message) or manually stopped. You can try to restart it by left clicking and choosing 'Start'. If it has automatically stopped, you may beed to acknowledge a LabView Error Message first. If it fails to start to green, call a beamline staff.