Status

  • Partial replacement of old, lossy cables to RF cables
    • Cable routing currently limited by available conduit space from the tunnels 
  • Current cable assignment documentation is incorrect and does not match assignments or installation status
  • Initial waveforms taken with the Digital Analyzer were incorrectly saved and need to be re-taken   
  • De-embedding of RF power levels measured outside of the tunnel yields un-realistic values: 
    • This will be further investigated at the next shutdown which will enable tunnel access
    • Yellow tags attached to tunnel power detectors do not match loss values in official drawings
    • Documented losses > 10 dB off expected values for worst offenders

CableStatus
AS1 Load FWD103Not installed
S Band Buncher FWD100Not installed
AS1 FWD102
AS1 REV104**Mislabelled in W0440646 as 101
AS2 Load FWD107
S Band Buncher REVn/a**Mislabelled in W0440646 as 104; no cable installed
AS2 FWD106
AS2 REV105Cable damage suspected

Data

  • All data stored here
  • Cable Installation document here W0440646 - PLAN - SSD2025 - Cable removal and installation for LINAC LLRF System
  • Reference drawing
    • LINAC tunnel 23W2495

Measurement Equipment

Equipment
Calibration and Settings

Peak RF Power Meter

Gigatronics

80350A/ 8652B

SN:1830822/8652601

Pulsed, RF triggered

Validated with R&S SMA100B pulsed RF output

Digital Serial Analyzer

Tektronix

DSA71254B

SN:8110800


Relevant Interlocks

  • KLY FWD and REV signals are connected to interlocks internal to the modulators

Setup Notes

SignalRF Cable from TunnelTunnel Pictures
AS1 Load FWD

103

(not installed)

VIDEO DETECTOR #7 

S Band Buncher FWD

100

(not installed)

VIDEO DETECTOR #4 

AS1 FWD102

VIDEO DETECTOR #6

AS1 REV101 is listed in the cable installation notes, but cable 104 is actually installed. Cable 101 does not appear to exist

VIDEO DETECTOR #5

AS2 Load FWD107

VIDEO DETECTOR #10

S Band Buncher REVAccording to the cable installation notes, 104. No cable actually installed

VIDEO DETECTOR #3

AS2 FWD106

VIDEO DETECTOR #9

AS2 REV

105**

This cable is suspected to be damaged due to out of nominal losses at 500 MHz (27 dB) and 3 GHz (23 dB) and needs to be replaced

VIDEO DETECTOR #8

KLY1 FWD108

MOD1 CP 

KLY1 REV109

MOD1 CP 

Kly2 FWD112

MOD2 CP

Kly2 REV113

MOD2 CP 

125 MHZ CAVnot yet assigned

?

500 MHZ CAVnot yet assigned

?

125 MHZ DRIVER FWDnot yet assigned

?

125 MHZ CAV FWDnot yet assigned

?

125 MHZ CAV REVnot yet assigned

?

500 MHZ DRIVER FWDnot yet assigned

?

500 MHZ CAV FWDnot yet assigned

?

500 MHZ CAV REVnot yet assigned

?

RF Power Level Calculations

Notes: These calculated de-embedded values are not consistently physically realistic; do not use these for any analysis or purpose. 
Noted here as the investigation continues to determine the sources of errors in drawings and documentation. 

Total Peak Power Summary

Peak Power Measurement at RackPeak Power in Tunnel, De-embedded

dBmdBmMW
AS1 Load FWD6.8109.997.3
S Band Buncher FWD10.4103.120.6
AS1 FWD8.4111.6145.9
AS1 REV-16.673.00.020
AS2 Load FWD4.9110.8119.9
S Band Buncher REV-14.961.90.002
AS2 FWD10.4113.5225.4
AS2 REV4.2100.812.1
Losses

RF Tunnel to Rack Cable LossCoupler cfInstalled AttenInternal Cable Loss+Atten (per Tag)Tag TotalDrawing Loss + Coupling TotalTotal Loss + cf in Peak power Measurement used for de-embedding

dBdBdBdBdBdBdB
AS1 Load FWD16.8353.263332.9986.2583.82103.08
S Band Buncher FWD16.1350.342626.2676.676.892.73
AS1 FWD1753.263332.9886.2484.19103.24
AS1 REV16.1353.262020.2473.571.4489.63
AS2 Load FWD19.8753.23332.8286.0283.82105.89
S Band Buncher REV16.1350.341010.2660.660.876.73
AS2 FWD16.8353.23333.186.384.05103.13
AS2 REV23.1553.262020.273.4673.4696.61