Location: 20 Lewis Hall, University of California, Berkeley
Contact: Chithra Asokan, PhD, Tel: (510)-643-0914, Email: [email protected]
To sign up for Equipment Trainings go here:
Catalysis Center Training Schedule
To sign up for EPR sample requests:
Instrumentations in Catalysis Laboratory
Please update the calendars below when reserving equipment
Instrument | Agilent GCMS | Waters LCMS | Perkin Elmer HRMS | Micromeritics 3Flex | Endeavor Pressure Reactor | Bruker FTIR | Shimadzu UV-vis | stopped-flow UV-vis/fluorescence | CD spectropolarimeter | Mettler Toledo ReactIR/EasyMax | Viscotek GPC | Shimadzu MALDI-TOF | Electrochem Setup | Microwave Reactor | glove box/CM2 robot |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Status | *off, restart on request | *recalibrate before use | X *down, user request only | ||||||||||||
SOP documents | SOP | SOP | SOP | SOP | SOP | SOP | SOP | SOP | SOP | SOP | |||||
Calendar | GCMS | LCMS | HRMS | Endeavor HPR | FTIR | UV-vis | Stopped-flow | CD | ReactIR | GPC | MALDI-TOF | Electrochem Setup | MW Reactor | glovebox and CM2 | |
Super user Contacts | Mathew See (Tilley) John Brunn (Hartwig): [email protected] |
Schedule
Schedule
Ion source: ESI and APCI
Columns available: Reverse phase C18 columns (both analytical and prep),
Reverse phase C8 column (prep),
HILIC columns (both analytical and prep).
Schedule
Ion Source: ESI and APCI
For HRMS, error < 5ppm
UPLC for fast LC analysis: 18000psi
Columns available: reverse phase C18 column
Cogent Diamond Hydride column
Schedule
Optical resolution: <0.2 cm-1
Time resolution: Rapid Scan: 110 spec/sec; Step Scan: 10 ns.
Schedule
The stopped-flow unit is also adapted to the FTIR spectrometer for IR kinetics.
Agilent 7890B-5977A GC-MS system Schedule
Malvern Viscotek GPC system Schedule
Mobile phase: THF
Molecular weight range: 1,000 – 200,000
Schedule
8 parallel reaction vails, 2 reaction gases, up to 500 psi, 200 °C
ReactIR15 and EasyMax ChemSynthesis Station
CD Spectrometer