Project Status

Rows may be sorted by clicking on column headings

Icon
 

Location

Project Name

Project Manager

Status

Start Date

Target Completion

Total Estimated Cost

5/16

B5/B16 IBT Moves

D. Galvez

Construction

Jun 2013

Apr 2014

$0.658M

5/16

B5/B16 Debris Removal

T. Mankowski

Construction

May 2013

Oct 2013

$0.1M

6/26/71B6/26/71 Fall ProtectionT. SamatuaClose OutJul 2013Dec 2013$0.255M
15B15 Optical Metrology LabD. GalvezClose OutDec 2012Feb 2014$1.447M

30

Solar Energy Research Center (UC Sponsored)

J. Feher

Construction

Aug 2012

Dec 2014

$54.4M

30

SERC Moves & Fitups

K. Haley

Planning

 

 

$1.127M

33, 75, 85, 25/A/BSeismic Upgrades Phase 2 - Construction (Non-ARRA) (B74, B85 & Demos Complete)T. GalvinConstructionJul 2011Apr 2015$97.04M
33B33 GPL Moves/Fit-UpsK. HaleyBid & Award  $4.063M
37B37 Utility ControlsB. TaylorClose OutDec 2012Sep 2013$0.942M
48B48 EOC ModificationT. SamatuaClose OutAug 2013Oct 2013$0.57M
48B48 2nd Floor Restroom ModificationT. SamatuaClose OutJun 2013Oct 2013$0.375M
48B48 Pedestrian SolutionJ. TullyPlanningSep 2013Jul 2014$0.143M
50AB50A ARU-1 ReplacementJ. TullyClose OutJun 2013Nov 2013$0.904M
50A/BB50A/B50B Deluge ModificationsT. SamatuaClose OutJul 2013Dec 2013$0.354M
50A/BB50A/B Low Roof SectionsJ. TullyPlanning  $0.225M
50BB50B Cooling Tower ReplacementJ. TullyClose OutMay 2013Nov 2013$1.172M
54B54 ADA Vertical Lift ReplacementT. SamatuaPlanningMar 2014Sep 2014$0.1M

59

Computational Research & Theory (UC Sponsored)

J. Heffernan

Construction

Dec 2011

May 2015

$124.944M

59

NERSC Relocation Project

J. Heffernan

Construction

Jul 2012

Dec 2015

$19.98M

59NERSC N8 Site PreparationJ. HeffernanPlanning  $2.1M

60

B60 Air Conditioning Chamber

D. Dovichi

Planning

Jan 2014

May 2014

$1.213M

70B70/R291 Lab UpgradeD. DovichiA&EJan 2014Aug 2014$1.136M
72A/CB72A & B72C Roof ReplacementT. SamatuaClose OutJul 2013Sep 2013$0.139M
74B74 ESD MovesT. GalvinClose OutAug 2012Jun 2013$1.121M
84B84 Boiler ReplacementB. TaylorPlanningMar 2014Aug 2014$1.7M
88B88 Seismic Bracing Caves 3 & 5T. SamatuaClose OutOct 2012Jan 2014$0.268M
88B88/R71 ConstructionD. GalvezClose OutJun 2013Nov 2013$0.99M

90/90X

User Test Bed Facility (ARRA)

D. Galvez

Construction

Jun 2012

Sep 2014

$15.9M

90B90 West Parking Lot PavingD. GalvezClose OutSep 2013Jan 2014$0.171M

Old Town

Old Town Demolition

T. Mankowski

Planning

 

 

$19.378M

SiteEmergency Eyewash StationsI. WhiteClose OutJan 2013Aug 2013$0.100M
SiteFall Protection B 54,84B,72,7J. TullyPlanning  $0.303M
SiteFiber Optic Comm Node UpgradeJ. HeffernanClose OutMay 2013Dec 2013$0.551M
SiteWilson Tract Shoring Wall ConstructionD. GalvezClose OutJun 2013Jan 2014$4.42M
Second Campus2nd Campus PlanningD. LockhartPlanning  $2.034M